YC W26: The Complete Analysis

Analysis of all 190 YC W26 startups. Hard-tech record, agent infrastructure density, service-as-software model, and the full table of every W26 company.
YC Welcome to Demo Day sign

YC Welcome to Demo Day sign

The YC W26 batch has 190 companies, 64% B2B, 74% AI-related. Fourteen reached $1M ARR by Demo Day, a record. Rebel Fund's ML algorithm, which has scored every YC company since 2012, rated 35% of W26 startups in the top 20% of all YC companies ever evaluated.

I attended Demo Day in person last week, spoke with many of the founders, and analyzed the batch company by company. Three patterns stood out:

  • The hard-tech cohort is the largest in YC history
  • Agent infrastructure is the most competitive category
  • The emerging model to watch is service-as-software

While AI continues to be the predominant theme, what that AI is being applied to is getting broader: robots, satellites, batteries, radar, dive gear, professional services. The shift across the last three YC batches:

Dimension S25 (Summer 2025) F25 (Fall 2025) W26 (Winter 2026)
Total companies 153 157 190
% AI-focused 80%+ ~80% 74%
Hard-tech companies 11 ~10 33 (record)
Robotics companies 2-3 10 14+
Thesis AI as product Agents automate value chains Physical AI + hard tech
AI infra signal 40+ 25 multi-agent ~39 dev tools

Hard Tech

Thirty-three companies tagged "Hard Tech" in YC's own directory. The cohort splits into two clusters.

Robotics and Physical AI

The larger cluster: around 21 robotics and physical AI companies.

Origami Robotics, Human Archive, Asimov, and One Robot are each building real-world physical data for training robot foundation models, each from a different angle. Origami is collecting manipulation data via a co-designed glove-robot system. Human Archive is deploying 1,000+ custom rigs to capture synchronized multimodal data. Asimov is collecting egocentric movement data from households and businesses across three continents. Congruent is doing the same for autonomous vehicles, building AI-native radar with its own training data and simulator. When four founders independently converge on the same bottleneck - real-world data - the bottleneck is probably real.

That data feeds a new deployment pattern. Capture the environment digitally, generate a simulation, fine-tune the robot policy in simulation, deploy. One Robot (whose team includes a NASA JPL veteran and a former Tesla Dojo engineer) is building the world models that make it possible.

The supply chain layer is forming alongside it. Hlabs is building the US-made robotics component supply chain: actuators, FOC motor controllers, Nvidia Jetson compute modules. The same "you can't fork a supply chain" observation from S25, now applied to robotics components specifically.

GrazeMate is deploying autonomous AI-powered drones to herd cattle, built by a founder who grew up on his family's 6,000-head cattle farm in Queensland. You can build the software from anywhere. You can't build the domain credibility.

Space, Defense, and the Industrial Base

The second cluster spans space and defense, with constraints ranging from manufacturing to physics.

Kyten Technologies, founded by ex-SpaceX and Starlink engineers who collectively deployed 5,000+ battery packs to orbit, is now building a domestic aerospace battery pack factory. The US drone and satellite industry needs a reliable American source for flight-grade batteries. Kyten's constraint is manufacturing expertise that took years on orbit to develop.

Beyond Reach Labs is building deployable solar arrays that expand from dining-table size to the scale of a football field in orbit, with a patented design that changes geometry in space. DAIVIN! is building tankless dive gear via real-time water electrolysis, targeting military and commercial diving applications. In both cases, the constraint is physics: the underlying science is genuinely hard to replicate.

On the defense side, Seeing Systems is building AI drone systems and has worked with multiple NATO forces. Milliray (formerly DroneTector) is building technology to detect and track hostile drones. AxionOrbital Space is taking an interesting angle on Earth observation: SAR-to-optical image translation. The bottleneck for using synthetic aperture radar data is that SAR images are unintelligible to most analysts. AxionOrbital is translating them into optical-quality images, enabling 24/7 Earth observation regardless of weather or lighting.

Across both clusters, the edge lives outside of software. In the S25 analysis, 11 companies were building for the physical world. In W26, 33 are.

As AI compresses the cost of building software, the constraints that can't be compressed become relatively more valuable.

→ All hard-tech companies


The Engine Room Fills Up

Around 39 developer tools and agent infrastructure companies are in the batch. This is the densest category.

In the S25 analysis, I mapped five AI infrastructure layers. In the F25 series, I noted 25 multi-agent orchestration companies in a single batch. W26 shows the next stage: a full agent stack taking shape, with each layer now populated by multiple teams.

  • Identity and access: who the agent is and what it's allowed to touch (Agentic Fabriq, Didit)
  • Payments: how agents spend money with oversight and audit trails (Sponge, Maven)
  • Observability and ops: monitoring, debugging, and keeping agents running in production (Moda, Cascade)
  • Safety and guardrails: runtime controls that prevent agents from acting beyond their scope (Salus, Sentrial)
  • Developer tools: building, testing, and deploying agents faster (Canary, OpenSpec)
  • Inference and compute: making agents run faster and cheaper at the hardware level (Piris Labs, RunAnywhere)

Three batches ago, each of these layers was a greenfield opportunity. Today, the stack is becoming predictable, and the layers look similar to what emerged in cloud infrastructure a decade earlier. The question has shifted from "what needs to be built?" to "who can build it in a way that's hard to replicate?"

Three patterns stand out among the companies that break through.

  • Founder credibility that can't be hired away: Mendral is founded by the creators of Docker and Dagger, building an AI DevOps agent. The people who built the previous generation of developer infrastructure are now building the next one.
  • Solving problems the stack itself created: Canary is building an AI QA engineer that reads source code to understand developer intent, addressing what Canary's founders describe as a 40%+ year-over-year increase in production incidents from AI-generated code. AI coding tools created a new category of bugs. Canary exists because of that.
  • Attacking the stack from a different dimension: Piris Labs is building photonic interconnects to address the memory bandwidth bottleneck in AI inference at the hardware level, with early results showing 5x lower latency. When everyone else is optimizing software, a hardware approach is inherently differentiated.

The bar for what counts as differentiated in agent infrastructure is higher than it was a year ago. The density of the companies here is a sign the category matters, not that the companies in it don't.

→ All developer tools and agent infra companies


The Regulated Frontier

Healthcare (22 companies), Fintech (29), Legal (7), and Compliance (10) make up a significant portion of the batch. A pattern that started with the S25 "Rebuilding Problem" (what you can't retrofit in regulated industries) and continued with the F25 "Compliance Wedge" (regulatory complexity as a moat) has taken another step.

Several W26 companies have expanded from building tools for regulated industries to running the professional services themselves. The model: service-as-software. In practice, AI does 80% of the work. Humans provide the oversight and the licenses.

  • Legal: General Legal is operating as an AI-native law firm for commercial contracts at flat fees ($500/contract). Stilta is building agentic AI for patent attorneys. LegalOS is running an AI-native immigration law firm with a 99%+ visa approval rate. These companies are capturing the margin of a professional services firm, not the margin of a SaaS tool.
  • Healthcare: Mango Medical is building instant planning with AI agents for orthopedic surgery, with early enterprise validation from a top orthopedic company. Beacon Health is deploying AI employees for primary care workflows. Opalite Health is solving language barriers in healthcare, a federally mandated need.
  • Fintech: End Close is automating reconciliation for high-volume payments companies, founded by the person who built the reconciliation division at Modern Treasury, which processed $1 trillion annually. Panta is an AI-powered commercial insurance brokerage targeting surplus and specialty lines, where licensed brokers handle strategy while AI handles the paperwork.

The constraint here is the license itself. The professional credential, the regulatory approval, the liability framework. These companies don't sell tools to professionals. They are the professional. The same pattern from the physical-world companies, applied to knowledge work.

Service-as-software represents about 4% of the batch. The risk profile is different from SaaS: these companies don't face customer churn in the traditional sense, but they do carry regulatory liability. If the model scales, it raises an interesting question: does software capture the value, or does the license?

→ All healthcare, fintech, legal, and compliance companies


Where W26 Points

YC's recently released Spring 2026 RFS is explicitly steering toward the physical world. Three of ten themes ask for companies that operate in atoms: "Modern Metal Mills," "Large Spatial Models," and "AI Guidance for Physical Work." A fourth, "AI-Native Agencies," validates the service-as-software model that emerged organically in W26.

When YC dedicates 30% of its new RFS to atoms, the investment thesis is no longer a subtext.

What to watch in X26:

  • Does the hard-tech cluster further expand?
  • Does agent infrastructure remain as dense?

The Takeaway

Across the batch, the same property surfaces. The companies with the strongest early positions own a constraint that can't be replicated with software: proprietary physical-world data, manufacturing expertise, regulatory trust, or a professional license.

The arc across three batches has been clear:

  • S25 proved agents could work.
  • F25 showed they could replace entire organizations.
  • W26 asks: as the cost of producing software compresses, what new constraints emerge?

The companies emerging now suggest an answer: the constraint is owning something you can't download.


Connect with me on LinkedIn for commentary on startup patterns as they emerge.


Appendix: All 190 YC W26 Companies

Grouped by the three sectors covered in this analysis, plus all remaining companies. Each company appears once, in the group that best fits its primary business.

Hard Tech, Robotics, Space and Defense

33 companies tagged "Hard Tech" in YC's directory, plus 2 closely related robotics companies (Asimov, Human Archive). ↑ Back to section

Company Description Sector Founders YC Partner YC Directory
Asimov Real-world human movement data for humanoid robots Hardware, B2B Anshul Verma, Lyem Ningthou Brad Flora Asimov on YC
Aurorin CAD Claude code for Mechanical Engineers B2B, Hardware, Hard Tech, Machine Learning / AI Michael Baron Jared Friedman Aurorin CAD on YC
AxionOrbital Space Foundation models for 24/7 Earth Observation Machine Learning / AI, Hard Tech, B2B Atharva Peshkar, Dhenenjay Yadav Tyler Bosmeny AxionOrbital Space on YC
Beyond Reach Labs Space solar arrays that grow to the size of a football field in orbit Hardware, Hard Tech Mitchell Fogelson, Pele Collins Diana Hu Beyond Reach Labs on YC
Button Computer Button is the wearable AI that can talk. Hard Tech, Consumer, Hardware, Machine Learning / AI Chris Nolet, Ryan Burgoyne Tyler Bosmeny Button Computer on YC
Confluence Labs Foundation models optimized for learning efficiency Machine Learning / AI, B2B, Hard Tech, SaaS Brent Burdick, Niranjan Baskaran Diana Hu Confluence Labs on YC
Congruent AI native radars for self-driving cars Machine Learning / AI, Hard Tech, Hardware, B2B Clement Barthes, Evan Carnahan Brad Flora Congruent on YC
Constellation Space AI operating system for mega-scale satellite networks. B2B, SaaS, Machine Learning / AI, Hard Tech Kamran Majid, Laith Altarabishi, Raaid Kabir, Omeed Tehrani Jared Friedman Constellation Space on YC
DAIVIN! Tankless Dive Gear - Breath Autonomy at Sea, Land & Space Hardware, Hard Tech Leo Kankkunen Tyler Bosmeny DAIVIN! on YC
Ditto Biosciences Evolutionary intelligence for autoimmune disease Healthcare / Biotech, Machine Learning / AI, Hard Tech Dennis Sun, Adair Borges, Emily Weiss Ankit Gupta Ditto Biosciences on YC
Galactic Resource Utilization Space, Inc. (GRU Space) Moon Hotel -> The Intergalactic Construction Company of Earth Hardware, Hard Tech, B2B, Consumer Skyler Chan Brad Flora Galactic Resource Utilization Space, Inc. (GRU Space) on YC
General Astronautics Robotics for Space R&D Hardware, Hard Tech Bram Schork Jon Xu General Astronautics on YC
GrazeMate Robot Cowboys that Herd Cattle with AI Drones Hard Tech, Machine Learning / AI, Hardware Sam Rogers Tyler Bosmeny GrazeMate on YC
Hlabs US-Made Parts for Robots Hardware, Machine Learning / AI, Hard Tech, B2B Paul Hetherington Brad Flora Hlabs on YC
Human Archive Multimodal data provider for robotics and world modeling Machine Learning / AI, B2B, Hardware Rushil Agarwal, Samay Maini, Raj Patel, Shloke Patel Jared Friedman Human Archive on YC
Inviscid AI Real-time Physics Simulations for Industrial Facilities & Data Centers Machine Learning / AI, Hard Tech, Hardware Kabir Jain, Ziming Qiu Ankit Gupta Inviscid AI on YC
Kyten Technologies Custom Aerospace-Grade Battery Packs Hardware, Hard Tech Lucas Maddox, Cooper McBride Jon Xu Kyten Technologies on YC
Milliray Technology to detect and track small drones Hard Tech, Hardware, Machine Learning / AI Thomas Doherty, Jordina Frances de Mas, Matthew Moore Milliray on YC
OctaPulse CV and robotics to automate quality inspection in fish farms Hardware, Machine Learning / AI, Hard Tech, B2B, Healthcare / Biotech Paul Grech, Rohan Singh Jon Xu OctaPulse on YC
One Robot World models for robot evals and training. Machine Learning / AI, Hard Tech, Developer Tools, Hardware Hemanth Sarabu, Elton Shon Jon Xu One Robot on YC
Origami Robotics Manipulate Anything Robot Machine Learning / AI, Hard Tech, B2B, Hardware Ryan Xie, Quanting(Daniel) xie Ankit Gupta Origami Robotics on YC
Piris Labs Cerebras-speed inference but scalable B2B, Hardware, Machine Learning / AI, Hard Tech, SaaS Ali Khalatpour, Keyvan Moghadam Ankit Gupta Piris Labs on YC
Polymath Worlds for training & evaluating long-horizon agents Machine Learning / AI, Hard Tech, B2B Dylan Ma, Naren Yenuganti Ankit Gupta Polymath on YC
Protent Protent turns passive surveillance into proactive intelligence. Hard Tech, SaaS, Machine Learning / AI, Hardware, B2B Srihan Balaji, Abhisheik Sharma Jon Xu Protent on YC
REV1 Claude Code for Mechanical Engineers B2B, SaaS, Hardware, Machine Learning / AI, Hard Tech Louis Liu, Alex Rivero Gustaf Alstromer REV1 on YC
RoboDock Robots that run autonomous depots for autonomous fleets. Hardware, Machine Learning / AI, Hard Tech, B2B, SaaS Celine Wang, Zinny Weli Gustaf Alstromer RoboDock on YC
RunAnywhere The default way of running on-device AI at Scale Developer Tools, B2B, Machine Learning / AI, Hard Tech Sanchit Monga, Shubham Malhotra Diana Hu RunAnywhere on YC
Seeing Systems Modular AI-Commanded Drones for Defence Hard Tech, Hardware, Machine Learning / AI, B2B Alexander Le Maitre, Matthew Le Maitre Ankit Gupta Seeing Systems on YC
Sequence Markets Low-latency execution across crypto, prediction, and tokenized assets Fintech, Machine Learning / AI, SaaS, Hard Tech Peter Bai, Muhammad Awan Brad Flora Sequence Markets on YC
Servo7 Robots that 10x manual industry work Machine Learning / AI, Hardware, Hard Tech, B2B Pieter Becking, Jasper van Leuven Ankit Gupta Servo7 on YC
Synthetic Sciences Claude Code for Scientific Research Machine Learning / AI, Hard Tech, Healthcare / Biotech, Developer Tools, SaaS Aayam Bansal, Ishaan Gangwani Gustaf Alstromer Synthetic Sciences on YC
Terranox AI The first AI-powered uranium discovery company Machine Learning / AI, Hard Tech Jade Checlair, Leeav Lipton Brad Flora Terranox AI on YC
Visibl Semiconductors AI-Native Broadcom as a Service Hardware, Machine Learning / AI, Hard Tech, B2B Jordon Kashanchi, Bryce Neil Tyler Bosmeny Visibl Semiconductors on YC
Voltair Autonomous Drones for Earth Observation Hard Tech, B2B, Hardware Hayden Gosch, Avi Gotskind, Ronan Nopp, Warren Weissbluth Tyler Bosmeny Voltair on YC
Voxel Energy Energy independent data centers with solar and repurposed batteries. Hard Tech, Hardware, Machine Learning / AI, B2B Max Pfeiffer, Evan Schmidt, Casey Spencer Jon Xu Voxel Energy on YC

Developer Tools and Agent Infrastructure

40 companies. ↑ Back to section

Company Description Sector Founders YC Partner YC Directory
21st Infrastructure and UI building blocks for the agentic internet B2B, Developer Tools Serafim Korablev, Sergey Bunas Ankit Gupta 21st on YC
Agentic Fabriq Okta for Agents. B2B, SaaS
Ashr Automated Multi-Modal Testing for Agents B2B, SaaS, Machine Learning / AI, Developer Tools Shreyas Kaps, Rohan Kulkarni Harshita Arora Ashr on YC
Canary The first AI QA engineer that understands your code B2B, SaaS, Developer Tools, Machine Learning / AI Aakash Mahalingam, Viswesh N G Jon Xu Canary on YC
Captain Give AI agents accurate knowledge search that scales B2B, Developer Tools, Machine Learning / AI
Caretta Realtime AI for Sales Calls SaaS, Machine Learning / AI, B2B, Developer Tools Kayra Bahadir, Omar Elamin, Pavlos Markesinis Tyler Bosmeny Caretta on YC
Cascade Distilling Proprietary Intelligence Machine Learning / AI, B2B Adam AlSayyad, Haluk Cem Demirhan Diana Hu Cascade on YC
Chamber The AIOps Agent for ML Teams Machine Learning / AI, Developer Tools, B2B Charles Ding, Andreas Bloomquist, Jason Ong, Shaocheng Wang Brad Flora Chamber on YC
CodeWisp Anyone can create real games with AI Consumer, Machine Learning / AI, SaaS, Developer Tools, Marketplace Elvin Fu Harshita Arora CodeWisp on YC
Compresr LLM context compression for better accuracy B2B, SaaS, Machine Learning / AI Berke Argin, Kamel Charaf, Oussama Gabouj, Ivan Zakazov Jared Friedman Compresr on YC
Corelayer AI on-call engineer for data-heavy, regulated industries B2B, Machine Learning / AI, Developer Tools, SaaS Mitch Radhuber, Shipra Jha Diana Hu Corelayer on YC
Crow Let users control your app through chat B2B, Machine Learning / AI, SaaS, Developer Tools Jai Bhatia, Aryan Vij Jared Friedman Crow on YC
Cumulus Labs The Fastest Multimodal Inference OS B2B, Developer Tools Suryaa Rajinikanth, Veer Shah Jon Xu Cumulus Labs on YC
Didit Identity platform for fast human verification. B2B, SaaS, Machine Learning / AI, Developer Tools Alberto Rosas, Alejandro Rosas Tyler Bosmeny Didit on YC
Emdash Open-source Agentic Development Environment Machine Learning / AI, Developer Tools, B2B Arne Strickmann, Raban von Spiegel Gustaf Alstromer Emdash on YC
Envariant Interpretability and reasoning infra for foundation models. B2B, Machine Learning / AI, Developer Tools Varun Agarwal Diana Hu Envariant on YC
Haladir Building Operational Superintelligence. B2B, Machine Learning / AI Jibran Hutchins, Quan Huynh, Preston Schmittou, Joseph Tso Diana Hu Haladir on YC
Klaus AI Fast and Safe OpenClaw on the cloud SaaS, Machine Learning / AI, Consumer Robbie Thompson, Bailey Wickham Tyler Bosmeny Klaus AI on YC
Lucent AI that automatically improves products from user behavior B2B, Developer Tools, SaaS Alisa Rae Gustaf Alstromer Lucent on YC
Mendral AI DevOps Engineer B2B, Developer Tools, SaaS Sam Alba, Andrea Luzzardi Ankit Gupta Mendral on YC
Moda The monitoring layer your AI agents need. B2B, Machine Learning / AI, SaaS, Developer Tools Mohammed Al-Rasheed, Pranav Bedi Ankit Gupta Moda on YC
Ndea Building AGI that can innovate. Francois Chollet, Mike Knoop Tyler Bosmeny Ndea on YC
OpenSpec Plan mode for complex features Developer Tools, Machine Learning / AI, B2B Tabish Bidiwale Jared Friedman OpenSpec on YC
Overshoot AI Infra for real-time vision applications Machine Learning / AI, Developer Tools, B2B Younes El hjouji, Zakaria El hjouji Jon Xu Overshoot on YC
Oximy See and control all AI activity across your enterprise B2B, SaaS, Machine Learning / AI Naman Ambavi Jared Friedman Oximy on YC
Q Labs AI research company solving generalization
RamAIn AI Employees: Super-fast computer use agents B2B, Developer Tools, SaaS, Machine Learning / AI Shourya Vir Jain, Vansh Ramani Tyler Bosmeny RamAIn on YC
Rubric AI Reasoning and verification infra for AI Machine Learning / AI, Marketplace, B2B, SaaS, Developer Tools Pragya Saboo Gustaf Alstromer Rubric AI on YC
Salus Guardrails to validate your agent's actions before they execute Kevin Pan, Vedant Singh Ankit Gupta Salus on YC
Sentrial Datadog for Agent Reliability B2B, Machine Learning / AI, Developer Tools, SaaS Neel Sharma, Anay Shukla Ankit Gupta Sentrial on YC
shortkit Short-form video infra for consumer apps Developer Tools, B2B, Consumer Neil Bhammar, Michael Seleman Brad Flora shortkit on YC
Sonarly Makes software self-healing B2B, SaaS, Developer Tools, Machine Learning / AI Dimittri Choudhury, Alexandre Klobb Jared Friedman Sonarly on YC
Sparkles Make everyone on your team an engineer Developer Tools, B2B Ai Daniil Bekirov Jared Friedman Sparkles on YC
Syntropy The agentic coding app for complex tasks. B2B, SaaS, Developer Tools, Machine Learning / AI Andrew Kuik, Saahil Sundaresan Ankit Gupta Syntropy on YC
Talking Computers The Autonomous Research Lab Machine Learning / AI, B2B Parsa Bahraminejad, Zayaan Mulla Ankit Gupta Talking Computers on YC
Terminal Use Vercel for background agents Machine Learning / AI, Developer Tools Filip Balucha, Stavros Filosidis, Vivek Raja Gustaf Alstromer Terminal Use on YC
The Token Company Compression middleware that improves LLM outputs B2B, Machine Learning / AI, Developer Tools Otso Veisterä Jared Friedman The Token Company on YC
Traverse Research lab for non-verifiable work Machine Learning / AI, B2B Lance Yan, Zachary Yu Jared Friedman Traverse on YC
VOYGR Real-world place intelligence for AI apps and agents Machine Learning / AI, B2B, Developer Tools, Consumer Vlad Baskakov, Yarik Markov Tyler Bosmeny VOYGR on YC
Zatanna Turning all software into agent-first APIs B2B, Developer Tools, SaaS Rithvik Vanga, Alex Blackwell, Tarun Vedula Jared Friedman Zatanna on YC

56 companies. ↑ Back to section

Company Description Sector Founders YC Partner YC Directory
10x Science The AI-native platform for next-generation protein characterization. B2B, Healthcare / Biotech, Machine Learning / AI, SaaS David Roberts, Andrew Reiter, Vishnu Tejus Jon Xu 10x Science on YC
Alt-X Automation for institutional-grade financial modeling in Excel Fintech, Machine Learning / AI
Arcline Startup legal work handled by elite lawyers & same-day turnaround Machine Learning / AI, B2B Pamir Ehsas, Stefan Mandaric Tyler Bosmeny Arcline on YC
AutoSitu AI-native workspace for development plan reviews B2B, Machine Learning / AI, SaaS George Zhai, Asher Lin Gustaf Alstromer AutoSitu on YC
Axis An AI Copilot for Trading Desks Fintech, Machine Learning / AI, B2B Ian Wang, Eric Zhu Ankit Gupta Axis on YC
Balance Full-Stack AI Accounting B2B, Fintech Mathias Løvring, Gus Levinson, Emil Munk Brad Flora Balance on YC
Beacon Health AI Employees for Primary Care Healthcare / Biotech, Machine Learning / AI, B2B Mark Pothen, Obinna Akahara Diana Hu Beacon Health on YC
BeeSafe AI Frontier AI Defenses for Social Engineering Attacks B2B, Fintech, Machine Learning / AI Daniel Spokoyny, Ariana Mirian, Nikolai Vogler Jon Xu BeeSafe AI on YC
CatchBack Cards The most thrilling way to create and rip digital collectible packs Consumer, E-commerce, Marketplace, Fintech Sophia Kim, Joseph Zhang Brad Flora CatchBack Cards on YC
CellType The agentic drug company. We simulate human biology. Healthcare / Biotech, Machine Learning / AI David van Dijk, Ivan Vrkic Ankit Gupta CellType on YC
Copperlane AI Mortgage Loan Officer Fintech, B2B, SaaS, Machine Learning / AI Athan Zhang, Brianna Lin Harshita Arora Copperlane on YC
Docura Health AI-Native Med-Legal Firm Healthcare / Biotech Akhil Sachdev Diana Hu Docura Health on YC
End Close AI powered reconciliation for high-volume payments companies Fintech, Machine Learning / AI, SaaS, B2B Sean Bolton, David Newell Brad Flora End Close on YC
Eos AI Autonomous OS for healthcare Healthcare / Biotech, Machine Learning / AI, B2B Arya Khokhar Diana Hu Eos AI on YC
Fed10 AI agents that replace your policy consultants B2B, SaaS, Machine Learning / AI Armand Iorgulescu, Zayan Islam, Winston Wei Jared Friedman Fed10 on YC
Fenrock AI AI agents for banking back office Fintech, Machine Learning / AI, B2B Michael M, Charu Sharma Jon Xu Fenrock AI on YC
Fort Strength Tracking Wearable Consumer, Hardware, Machine Learning / AI, Healthcare / Biotech Miranda Nover, Paul Schneider, Zac Valles Gustaf Alstromer Fort on YC
Forum The first regulated exchange to trade on attention. Fintech, Marketplace, Consumer Owen Botkin, Joseph Thomas Jared Friedman Forum on YC
FullSeam AI agents for corporate accounting teams B2B, SaaS, Fintech, Machine Learning / AI Thomas Dowling, Aaron Coppa, Geoff Segal Brad Flora FullSeam on YC
General Legal The AI native law firm for growth stage companies B2B J.P. Mohler, Javed Qadruddin, Ryan Walker Ankit Gupta General Legal on YC
Grade API for performance-based payroll Fintech, B2B, Machine Learning / AI Lotanna Ezeike, James Heaney Brad Flora Grade on YC
Jinba Automate enterprise workflows through chat B2B, SaaS, Developer Tools, Fintech Shoya Matsumori, Takuya Norisugi Ankit Gupta Jinba on YC
Kita Automate credit review for lenders in emerging markets Fintech, B2B, SaaS Carmel Limcaoco, Rhea Malhotra Ankit Gupta Kita on YC
LegalOS The AI-Native Immigration Law Firm B2B, SaaS, Machine Learning / AI Matthew Asir, Rachel Asir, Claire Jutabha Tyler Bosmeny LegalOS on YC
Mango Medical Foundation models for planning orthopedic surgery Healthcare / Biotech, Machine Learning / AI, B2B, SaaS Adrian Kilian, Jorge Padilla Perez Tyler Bosmeny Mango Medical on YC
Mantis Digital Twins of humans Consumer, Healthcare / Biotech, Machine Learning / AI Georgia Witchel Gustaf Alstromer Mantis on YC
Maven Payments Infrastructure for Voice Agents B2B, Fintech, SaaS, Machine Learning / AI Brandon Boehme, Wasi Ahmed Ankit Gupta Maven on YC
Maywood Automating the entire IB deal workflow Machine Learning / AI, B2B, Fintech, SaaS Drake Goodman, Kent Goodman, Esteban Vizcaino Jon Xu Maywood on YC
MochaCare Agentic Management Service for Care Organizations Healthcare / Biotech, SaaS, Machine Learning / AI, B2B Nick Walker, Pranav Uppiliappan Diana Hu MochaCare on YC
MouseCat AI-powered fraud investigations Fintech, B2B, Machine Learning / AI, SaaS Nicholas Aldridge, Joseph McAllister Jared Friedman MouseCat on YC
Opalite Health Helping Healthcare Providers Speak Any Language B2B, SaaS, Machine Learning / AI, Healthcare / Biotech Cathleen Kuo, Alex Mehregan Tyler Bosmeny Opalite Health on YC
Origin AI and Data for Cancer Therapeutics Machine Learning / AI, Healthcare / Biotech Malhar Bhide, Yash Rathod Ankit Gupta Origin on YC
Orthogonal Agentic Payments for APIs Fintech, Developer Tools, B2B Christian Pickett, Bera Sogut Tyler Bosmeny Orthogonal on YC
Overdrive Health AI-Native Medical Billing Services Healthcare / Biotech, B2B, Machine Learning / AI
Oxus AI-powered automation for internal audit workflows SaaS, B2B, Machine Learning / AI Janet Liu, Melinda Liu, Christine Watts Diana Hu Oxus on YC
Palus Finance 40% higher yields on company cash, in under 5 minutes. Fintech, B2B Michael Gonzalez, Sam Lushtak Brad Flora Palus Finance on YC
Panta AI Native Commercial Insurance Brokerage Fintech Vincent Chen, Frank Wang Gustaf Alstromer Panta on YC
Patientdesk.ai AI front & back office agent for dental practices Healthcare / Biotech, Machine Learning / AI, B2B Emre Kaplaner, Fikri San Koktas, Oncel Ozgul Gustaf Alstromer Patientdesk.ai on YC
Payna AI Licensing Agent for Regulated Industries Fintech, B2B, SaaS Aaron Chen, He Song Brad Flora Payna on YC
Prana An AI primary care doctor in your pocket Healthcare / Biotech, B2B, Consumer Meer Patel, Sanjit Menon, Vishvam Rawal Tyler Bosmeny Prana on YC
Proximitty Autonomous business loan servicing B2B, Fintech, SaaS Wye Yew Ho, Zi Zhang Diana Hu Proximitty on YC
Rhizome AI Agent Platform for Life Sciences Healthcare / Biotech, SaaS, B2B Chetan Mishra Tyler Bosmeny Rhizome AI on YC
Ruma Care The operations stack for biologic infusion clinics Healthcare / Biotech Christina Huang, Meng Fei Shen Jon Xu Ruma Care on YC
Scheduling Wizard Logistics infrastructure to modernize healthcare operations Healthcare / Biotech, Machine Learning / AI, SaaS, B2B Zachary Dermody, Abdelrahman Hamimi, Samuel Oberly Diana Hu Scheduling Wizard on YC
Sponge Financial infrastructure for the agent economy Fintech, E-commerce, Machine Learning / AI, SaaS Eric Zhang, Jae Choi, Rishab Luthra Brad Flora Sponge on YC
SpotPay Stablecoin Global Bank Account Fintech, Consumer Thomas Cesare-Herriau, Zsika Phillip Tyler Bosmeny SpotPay on YC
Stilta Agentic AI for intellectual property B2B, Machine Learning / AI, SaaS Oscar Adamsson, Oskar Block, Tobias Estreen, Petrus Werner Gustaf Alstromer Stilta on YC
Strand AI Multimodal foundation models to predict uncollected patient biology Healthcare / Biotech, Machine Learning / AI, B2B Yue Dai, Oded Falik Jon Xu Strand AI on YC
Tepali AI-native operating system for medspas Machine Learning / AI, Healthcare / Biotech, Fintech, B2B, SaaS Chrisvin Jabamani, Vishnu Pathmanaban Diana Hu Tepali on YC
Unifold Multi-chain deposit and payment infrastructure Developer Tools, Fintech, Consumer, B2B, SaaS Hau Chu, Timothy Chung, Quang Huynh Brad Flora Unifold on YC
Valence Unified prediction markets trading platform Fintech, Consumer, B2B Daniel Kasabov-Nouvion, Neo Wang, Arthur Zhou Diana Hu Valence on YC
Valgo Insurance risk layer for physical AI Machine Learning / AI, B2B, SaaS Robert Moss, Sydney Katz, Jon Qian Jared Friedman Valgo on YC
Vector Legal Full service ai law firm & software solution, for startups Machine Learning / AI, SaaS Mitch Duncombe, Keenan Venuti Jared Friedman Vector Legal on YC
Verdex AI Verification for Insurance Machine Learning / AI, Fintech Jad Bousselham, Evan Rankin Jon Xu Verdex on YC
Wayco AI operator for medlegal cases B2B, Machine Learning / AI, SaaS, Marketplace Iqbol Temirkhojaev Jared Friedman Wayco on YC
ZeroSettle Drop-in Direct Billing SDK for In-App Purchases B2B, Fintech, SaaS, Developer Tools Ryan Elliott, Gabe Roeloffs Brad Flora ZeroSettle on YC

All Other Companies

59 companies.

Company Description Sector Founders YC Partner YC Directory
Aemon The Forward-Deployed AI Research Engineer Machine Learning / AI, B2B, SaaS Ray Xu, Richard Zhou Jon Xu Aemon on YC
ARC Prize Foundation AI benchmarks that measure general intelligence and inspire new ideas Machine Learning / AI Greg Kamradt Tyler Bosmeny ARC Prize Foundation on YC
Autumn AI Stalk your prospects at scale. B2B Shiv Kampani, Vishnu Sampathkumar Ankit Gupta Autumn AI on YC
Avoice Harvey for Architecture Machine Learning / AI, B2B, SaaS Chawin Asavasaetakul, Chawit Asavasaetakul Jared Friedman Avoice on YC
Booko Dynamically pricing the whole economy. B2B, SaaS, Machine Learning / AI, E-commerce, Marketplace Will Hall, Arjun Saluja Harshita Arora Booko on YC
Bubble Lab The ops super-employee in Slack B2B, SaaS, Machine Learning / AI Selina Li, Zach Zhong Diana Hu Bubble Lab on YC
Burt AI teammates for logistics B2B, Machine Learning / AI, SaaS Bobby Zhong, Kurt Sharma Ankit Gupta Burt on YC
Byteport Global upload acceleration for 1GB-100TB files. B2B Jayram Palamadai Tyler Bosmeny Byteport on YC
Cajal Scaling formal verification to accelerate scientific discovery B2B, Machine Learning / AI Luke Johnston, Pedro Nobre Diana Hu Cajal on YC
Cardboard Agentic video editor Consumer, SaaS, Machine Learning / AI, Social Saksham Aggarwal, Ishan Sharma Ankit Gupta Cardboard on YC
Cardinal AI Platform for Precision Outbound B2B, SaaS Devi Jha, Jianna Liu Gustaf Alstromer Cardinal on YC
Carson Carson is a desktop AI app that generates custom, sharable workspaces B2B, Machine Learning / AI, SaaS, Social Ketan Agrawal, Milan Bhandari, Alex Iansiti, Sid Menon Gustaf Alstromer Carson on YC
Chasi AI Revenue Engine for the Equipment Industry B2B Akash Pavan, Sarman Aulakh Gustaf Alstromer Chasi on YC
Clam Self-fixing automations for fast-moving startups built on OpenClaw B2B, SaaS, Machine Learning / AI Vaibhav Agrawal, Anshul Paul Clam on YC
Cofia AI automations that write themselves B2B, Machine Learning / AI, SaaS Paola Martinez, Moses Wayne Gustaf Alstromer Cofia on YC
Condor Energy Software for enterprise energy procurement. B2B, SaaS Jean Costa de Beauregard, Clément Grivel, Florian Pérocheau Jared Friedman Condor Energy on YC
Corvera AI agent workforce for CPG back-office B2B, SaaS, Machine Learning / AI Dirk Breeuwer, Matthew Collins, Christopher Kong Brad Flora Corvera on YC
Crosslayer Labs Protect, monitor and defend your Internet presence B2B, SaaS Henry Birge-Lee, Grace Cimaszewski, Prateek Mittal Tyler Bosmeny Crosslayer Labs on YC
Dazzling Coding agents for science
Doomersion Doomscroll to learn languages Education, Consumer, Social, Machine Learning / AI, SaaS Mostafa Afr Jared Friedman Doomersion on YC
EigenPal AI Document Workflows for Enterprises B2B, Machine Learning / AI, SaaS Jedrzej Blaszyk, Matej Novak Jared Friedman EigenPal on YC
Fern (Formerly Ishiki Labs) Proactive AI assistant starting with sales Consumer, SaaS, B2B, Machine Learning / AI Robert Xu, Amit Yadav Gustaf Alstromer Fern (Formerly Ishiki Labs) on YC
Fixture An AI-first CRM built for Startups Machine Learning / AI, B2B, SaaS
Hex Security Agentic Offensive Security at Scale B2B, SaaS, Machine Learning / AI Huzaifa Ahmad, Ahmad Khan, Prama Yudhistira Gustaf Alstromer Hex Security on YC
Lance AI Agents That Run Hotel Operations. B2B, SaaS, Machine Learning / AI Caleb Chan, Gavin Brennen, Gatik Trivedi Diana Hu Lance on YC
Laurence Autonomous performance marketing Machine Learning / AI, E-commerce, Consumer, B2B Matthew Chen, Leo Gierhake Harshita Arora Laurence on YC
Lexius AI for Corporate Security Cameras Machine Learning / AI, SaaS, B2B David Elskamp, Liam Webster Brad Flora Lexius on YC
Librar Labs Autonomous AI with taste. B2B, Machine Learning / AI Jonathan Görtz, Carl-Hugo Jacobsson, Kaan Sirin Jared Friedman Librar Labs on YC
Luel Turning everyday words and actions into usable training data. B2B, Marketplace, Machine Learning / AI, Consumer William Namgyal, Inigo Lenderking Harshita Arora Luel on YC
Martini AI Video Production for Professionals Machine Learning / AI, B2B, SaaS, Consumer Koh Terai, Long Hoang Jared Friedman Martini on YC
Menza The AI data analyst for consumer brands B2B, Machine Learning / AI, E-commerce, SaaS, Consumer
o11 The AI Agent Inside Every Enterprise App B2B, SaaS, Machine Learning / AI, Consumer Aryah Oztanir, Ajay Misra Jared Friedman o11 on YC
Pax Historia The first AI-powered grand strategy platform Consumer, Marketplace, Social, Machine Learning / AI Eli Bullock-Papa, Ryan Zhang Harshita Arora Pax Historia on YC
Perfectly The AI-native Recruiting Agency B2B, Machine Learning / AI, SaaS Victor Luo, Zhuang (Gary) Luo, Huimin Xie Tyler Bosmeny Perfectly on YC
Pocket Take Notes in the Real World Consumer Gabriel Dymowski, Akshay Narisetti Tyler Bosmeny Pocket on YC
Pollen AI agents that automate customer success B2B, SaaS, Machine Learning / AI Noah Yin, Aldrin Ong, Jeffrey Yum Jon Xu Pollen on YC
Pollinate AI Agents for the supply chain. B2B Adeep Mitra, Corey Berther Ankit Gupta Pollinate on YC
Polymorph Personalization infra that improves retention, LTV, and CAC B2B, SaaS David Nie, Manas Purohit, Andrew Sy Brad Flora Polymorph on YC
Q2Q We help private equity teams find acquisition targets faster Harshita Arora Q2Q on YC
Reframe AI-native, hardware procurement marketplace B2B, Hardware, Marketplace, SaaS Eric Wiener, Bryan Zin Brad Flora Reframe on YC
Remix Social media content auto-generated with your existing data Consumer, Machine Learning / AI, Social
Ressl AI AI Workers for Field Services B2B, Machine Learning / AI Abhishek E, Arushi Gandhi Harshita Arora Ressl AI on YC
Return Signals Proactive AI customer support that engages high-value users B2B, Machine Learning / AI, SaaS Ilya Valmianski, Alejandro Zaniolo Gustaf Alstromer Return Signals on YC
Revion Intelligence for Automotive Operations B2B, Machine Learning / AI, SaaS Zaki GW, Hanbo Xie Jon Xu Revion on YC
Robby AI agents that grow revenue for home services businesses B2B Vineet Jammalamadaka, Feroze Mohideen, Joseph Schwarzmann Gustaf Alstromer Robby on YC
Samora AI Multilingual voice agents that outperform humans B2B, SaaS, Machine Learning / AI Vineeth Kumar, Kartik Sawhney, Shakul Raj Sonker Tyler Bosmeny Samora AI on YC
Scout Out Keeping contractors on the job site, not behind a desk. B2B, Machine Learning / AI, SaaS Nolan Rossi Tyler Bosmeny Scout Out on YC
Shofo The World's Largest Video Library B2B, Machine Learning / AI Bryan Hong, Andre Braga, Braiden Dishman, Alexzendor Misra Jared Friedman Shofo on YC
Sila Agentic Workspace Messaging B2B, SaaS, Machine Learning / AI Mith Paresh Patel, Carl Huang Diana Hu Sila on YC
sitefire Marketing suite for the agentic web Machine Learning / AI, B2B, SaaS, E-commerce Vincent Jeltsch, Jochen Madler Jon Xu sitefire on YC
Skillsync Hire engineers based on what they've shipped SaaS, Machine Learning / AI, B2B, Social Narayana Aaditya Ganeshkumar, Nishant Joshi Tyler Bosmeny Skillsync on YC
Squid AI agents for power grid planning B2B, Machine Learning / AI, SaaS Conor Jones, George Kolokotronis Gustaf Alstromer Squid on YC
Travo The data infrastructure for real estate Machine Learning / AI, SaaS, B2B Clarence Chen, Alexander Calafiura, Michael Dalva, Ashwin Sriram Aaron Epstein Travo on YC
Unisson AI agents that automate B2B software implementation Machine Learning / AI, B2B, SaaS Varun Mathur, Tom Achache Diana Hu Unisson on YC
Vela AI Agents For Complex Scheduling Coordination Machine Learning / AI, B2B, SaaS Gobhanu Sasankar Korisepati, Saatvik Suryajit Korisepati Jon Xu Vela on YC
Ventura AI Teammates for Industrial Distributors B2B, Machine Learning / AI, SaaS Jack Collins, Swen Koller Brad Flora Ventura on YC
Veriad Enterprise marketing agents B2B, Machine Learning / AI, SaaS Rohan Mahendraker, Anton Muratov Jon Xu Veriad on YC
Wideframe AI coworker for video editors to ship more video faster Machine Learning / AI, SaaS, B2B Daniel Pearson, Zachary Kim Brad Flora Wideframe on YC
Zymbly Automates admin for aircraft mechanics B2B, Machine Learning / AI, SaaS Robbie Bourke, Azmat Habibullah, Ben Jacob Jared Friedman Zymbly on YC